Buying land and building the house you want is a common goal for buyers looking outside city limits. It can work out well, but a tract that looks perfect from the road is not always ready for a house. The time to find out is before you close.

Our earlier guide to acreage due diligence covers existing wells, septic systems, surveys, and easements. Here the focus is on what it takes to build something new in unincorporated Ellis County.

Who has jurisdiction

First, is the land inside a city, in a city's extraterritorial jurisdiction (ETJ), or fully in the county? The county's Subdivision and Development Standards say that platting for land inside city limits is handled by that city, while land partly or wholly in an ETJ follows an interlocal agreement between the county and the city. If you are unsure, the county asks you to contact the Department of Development first.

Outside city limits, permits are still required. The department's FAQ says permits have been required in unincorporated areas since the late 1970s and can take a minimum of three weeks to process and approve. The same FAQ explains that the county has no zoning powers like a city and cannot enforce private deed restrictions, so neighboring land uses are not controlled the way they would be inside a city, and deed restrictions are enforced privately. Read any restrictions in the title commitment carefully.

The county also offers a pre-development meeting with staff to go over a specific project and the regulations.

Lot size, road frontage, and platting

The county standards set minimums for any property intended for development, platted or not:

  • At least 1 acre if the property will use public water and a septic system, or at least 2 acres with a private water well and septic, or as approved by the Prairielands Groundwater Conservation District.
  • Frontage directly on a public road, with at least 150 feet of paved public street frontage. Lots on private roads may be allowed if the roads meet county standards.
  • No flag lots.
  • Building setbacks of 25 feet from the right-of-way, or 50 feet along TxDOT roads and thoroughfare-plan roads 100 feet or wider.

If a seller is carving your tract out of a larger one, ask how. Under the same standards, a plat is generally required when a tract is divided into two or more parts, unless a state-law exemption applies and is documented with a filed Platting Exemption Affidavit. Confirm this before closing, since a tract split off without meeting the rules can create permit problems later.

What the building permit asks for

The Department of Development's permits page lists what a new home application needs: a floor plan, a site plan showing the house and driveway, a culvert application, a 911 address application, and a copy of the recorded deed if the property has been owned for less than three years.

Septic: plan it before you design the house

Without a sewer connection, a home needs an on-site sewage facility, or septic system. The county's septic order requires an application, permit, and inspection to build, alter, extend, or repair a system regardless of tract size. Designs must come from a registered sanitarian or professional engineer, site evaluations must be done by a professional engineer or registered sanitarian with a TCEQ site evaluator license, and the design must show existing and planned structures such as guest houses, pools, barns, wells, and driveways.

You may read about a statewide 10-acre exemption from septic permitting, but TCEQ notes that local programs can be more stringent, and Ellis County's order applies regardless of tract size. System type matters too: the permits page notes that an aerobic system requires a soil evaluation, a filed affidavit, and an initial maintenance contract. If you are considering a guest house, the county standards require the septic application at the same time as the permit, with certification that the system has enough capacity.

Water and electric service

For water, the Public Utility Commission's CCN Mapping Resources page explains that a Certificate of Convenience and Necessity gives a retail utility, including water supply corporations, the exclusive right to serve a defined area, and it points to the Water and Sewer CCN Viewer for looking up the provider for an address. A nearby water line does not automatically mean service is available, so ask the provider about meter availability, costs, and timing.

If you plan to drill a well instead, the Prairielands Groundwater Conservation District rules require registration before drilling, a minimum of 2 acres per well, and spacing from property lines and other wells.

For electricity, HILCO Electric Cooperative lists Ellis among its counties and asks new-construction applicants for a 911 address, a permit, and notarized neighbor easements if applicable, suggesting 3 to 5 weeks, with line extension fees set after a field visit. Navarro County Electric Cooperative also serves portions of Ellis County and assigns a staking technician when new line construction is needed. The PUC's electric service territory map helps confirm which utility serves a location.

Driveways, culverts, and roads

The county FAQ says permits are required for driveways and culverts so they are sized and placed correctly for drainage. The county's construction standards require a permit for each drive and culvert and state that homeowners, not the county, maintain culverts. If the land is in a private subdivision, the FAQ notes the county provides no maintenance of roads or drainage there; that falls to the owners or HOA.

Floodplain

Check the FEMA Flood Map Service Center early. The county FAQ says you can build in the floodplain, though it will likely require an elevation certificate, but you cannot build in the floodway. The county standards also require elevation certificates for lots within the 100-year floodplain. The practical question is whether there is enough buildable ground outside those areas for the house, septic field, and driveway.

A short checklist before you close

  • Confirm city limits or ETJ, and whether the tract is legally platted or exempt.
  • Measure road frontage and confirm the road is public or built to county standards.
  • Have a site evaluation done during the option period if possible.
  • Confirm the water provider or well plan, and get an electric service estimate.
  • Pull the flood map and look at drainage on the ground.
  • Talk to a lender early; our post on financing land and acreage in Texas explains how land loans differ.

Rules change, so verify everything with the county and utilities directly. If you are looking at land to build on in Ellis County and want help sorting through a specific property, our team is glad to walk through it with you.

Sources

  1. Ellis County, Quality Growth Initiatives, Volume I: Subdivision and Development Standards (PDF, effective June 1, 2026).
  2. Ellis County Department of Development, Links and FAQs.
  3. Ellis County Department of Development, Permits.
  4. Ellis County, On-Site Sewage Facility Order (PDF, with TCEQ approval letter, April 2024).
  5. Texas Commission on Environmental Quality, Getting a Permit for an OSSF.
  6. Public Utility Commission of Texas, CCN Mapping Resources and Water and Sewer CCN Viewer.
  7. Prairielands Groundwater Conservation District, District Rules (PDF, effective April 21, 2025).
  8. HILCO Electric Cooperative, Apply for Service.
  9. Navarro County Electric Cooperative, New Service and About Us.
  10. Public Utility Commission of Texas, Electric Service Territory Map.
  11. Ellis County, Quality Growth Initiatives, Volume III: Standard Construction Details (PDF, effective April 1, 2026).
  12. FEMA, Flood Map Service Center.